Plexus: Planning for success in complex projects
  Home Products Company News Contact Legal  

 

 
 

Features

See also Advantages and Benefits  

  • Functional
    • Plan Authoring
      • unique project representation
      • intuitive & seductive visual authoring with sophisticated auto layout and navigation of project logic in multiple views (Network, Matrix (Design Structure Matrix - DSM), Timeline (Gantt), Spreadsheet)
      • multiple grouping hierarchies (in user defined Dimensions) for activities (in all views)
      • extensive filter and highlight mechanisms
      • comprehensive resource model
      • conventional project mgt constructs
      • multi interdependent projects (horizontal and vertical integration)
      • import from other planning systems (including Excel)
      • intelligent tools that cut, copy and splice reusable project logic from auditable sources into new project models (c.f. standard networks, fragnets etc.)
    • Plan Analysis
      • automatic activity classification based on topology
      • uncertainty (risk) analysis
      • nominal critical path (and chain) analysis between two activities
      • Design Structure Matrix method (DSM)
      • impact analysis of working with immature information
    • Plan Optimisation
      • Discrete Event Simulator - DES
      • multiple resource scenarios for what if analysis
      • automatic schedule generation through sophisticated optimisation, DES, and trade-off surface analysis
      • automatic resource de-confliction!
      • choice of schedules can take into account robust measures for time and cost as well as maturity
    • Plan publishing
      • baseline, live and unlimited what-if project schedules can be viewed and saved within the tool
      • to other planning tools (including roundtripping with MS Project)
      • filtered (tailored) Excel ToDo lists
      • HTML
      • 'wallpaper' (whole network or filtered) print-out
    • Plan Execution
      • capture of actual and forecast progress (in tool or imported from another system e.g. MS Project synchronisation.
      • variance and BRAG reporting
      • export to earned value reporting tools
      • impact analysis (using the Integrated Master Schedule - IMS), rescheduling and selective rescheduling due to slippage and local changes
      • intelligent reprogramming of plan due to significant changes in circumstances
  • Non-functional
    • multi-user
      • concurrent and asynchronous, geographically distributed modelling
      • role-based permissions based on context (work breakdown, work centre etc)
      • relational database provides authentication and authorisation
      • audit record
    • configurable automatic error checking and warnings
    • extensive i/o